While the Not-So-Super Mario Brothers tinker with the plumbing and
heating (they have now had to return four times to re-do/complete various
parts of their brief and some things are STILL not right), the other contractors have been plastering away.
From the top down, the house has gradually been covered in a pristine layer of white, starting with the bedrooms under the roof:
|
Twins' bedroom |
|
Spare room |
Down to the first floor, where all the walls have been plastered, save the front facade which is still waiting to be insulated from the inside:
|
Back bedroom |
|
Front dressing room |
The rear facade has also been insulated from the outside, and plastered.
|
Rear bedroom, from the flat roof |
The ground floor is however a story for another day...