Sunday, July 29, 2012

More Than Words

An update in pictures of the house as it looks at the end of July.

  • At the front, we have a sparkling new cornice (which rather puts the rest of the facade to shame)
    
  • The balcony rail has been replaced, and the balcony itself strengthened;



  • The back of house has been rebuilt, and now has window frames fitted (but no glass yet).


<><> <><> <><>
That very big kitchen window




The back of the house

    

The internal windows from the landing down to the kitchen (straight ahead) and sitting room (on the left)
  • The roof has been completely replaced and insulated,
The top mezzanine - the heating system will go at the far end.
  • Plastering has started, from the top down.
Plasteing around the new window, looking out onto the flat roof above the kitchen
  • Electric wiring has been laid.


  • ...as have pipes for heating, water and ventilation.

Hopefully things will begin to look very different very soon...

No comments: