- At the front, we have a sparkling new cornice (which rather puts the rest of the facade to shame)
-
- The balcony rail has been replaced, and the balcony itself strengthened;
- The back of house has been rebuilt, and now has window frames fitted (but no glass yet).
That very big kitchen window |
The back of the house |
-
The internal windows from the landing down to the kitchen (straight ahead) and sitting room (on the left) |
- The roof has been completely replaced and insulated,
The top mezzanine - the heating system will go at the far end. |
- Plastering has started, from the top down.
Plasteing around the new window, looking out onto the flat roof above the kitchen |
- ...as have pipes for heating, water and ventilation.
Hopefully things will begin to look very different very soon...
No comments:
Post a Comment