Up on the top floor, we are beginning to get an idea of the final finish. Floorboards are being sanded...
... and the bathroom has been tiled.
![]() |
| The internal walls on the left - with doorway to the WC and staircase leading to the back garden. |
![]() |
| .. and this is what is looks like from the other side (staircase still to come) |
![]() |
| The first attempt and insulating the floor. Has since been re-done, since not it was properly glued... |
![]() |
| The internal windows being plastered |
![]() |
| The ceiling going in |
![]() |
| Close up of that ceiling. Cool eh? |
![]() |
| The floor tiles have arrived! |